top of page

House Improvements

4 bed/2 bath House

  1. New flooring throughout:

    • Hardwood (oak) – 2022

    • Ceramic tile – 2022

    • Vinyl – 2021 & 2024

    • Carpet – 2024

  2. Windows – 2022

  3. Full window door with built in blinds in master bedroom – 2022

  4. Exterior steel door in laundry room – 2024

  5. Storm/screen doors x 2 – 2024

  6. 2 New decks with Trex decking – 2022

  7. Septic System (1500 gallon tank) – 2024

  8. Washer (frontloading) & Dryer – 2022

  9. Electric stove – 2020

  10. Pine trim throughout - 2024

  11. Shower surround tiled in guest bathroom - 2024

  12. Dishwasher – 2021

  13. Metal roof – 2022

  14. HVAC (furnace & central air conditioning) – 2022

  15. Gas stove/fireplace – 2024

  16. 200 amp electrical service - 2024

  17. New interior LED lighting – 2022 - 2024

  18. Ring camara/motion sensor lights - 2024

  19. All rooms renovated between 2021 and 2024

  20. Plumbing replaced in 2021 and drain pipes replaced in 2024

 

Apartment/Casita Improvements

  1. Windows - 2024

  2. Storm/screen door - 2024

  3. New flooring in bedroom and bathroom - 2024

  4. Stove and refrigerator - 2022

  5. Bathroom completely remodeled and rewired; also added wall heater - 2024

  6. Mudroom built in 2023 (It needs to be finished on the inside.We were going to put a washer and dryer in there.)

Orchard Improvements

  1. Irrigation pump and well casing replaced and rewired 2023

  2. Mature trees trimmed back to main trunks and branches 2022

  3. Underground drip irrigation system installed 2023

  4. Baby trees planted 2022 (some died and will need to be replanted)

  5. Old holding pond was bulldozed and we reclaimed almost 1 acre of plantable land by doing that

  6. Electric fence installed between barn and house 2024

  7. Gates installed between barn and carport 2024

​

Barn/Shop Improvements

  1. Shop structure rebuilt and replaced with steel beams – 2024

  2. New siding and metal roof – 2024

  3. Large industrial shop doors x 2 – 2024

  4. 200 amp electrical service - 2024

  5. Shop and adjoining rooms rewired including new breaker boxes – 2024

  6. Huller (cleaner) secured to new concrete and then rewired - 2025

  7. New LED lighting fixtures (interior and exterior) - 2024

  8. Half window rear steel personnel/man door - 2024

  9. Ring camara/motion light (on back side of barn) - 2024

  10. French doors (on room that was intended to be the new storefront) - 2024

​

 7.  New refrigerator and stove – 2021

 8.  New siding and metal roof – 2024

 9.  Mini-splits - 2022

10. LED interior lights - 2023

Listing info for website page.jpg
bottom of page